Requires Javascript to run jquery-core script

Skip to Main Content

Projects

Recent transportation equipment engineering, safety-critical systems and high-tech product development projects.

LA Metro Orange Line BRT Intersection Delay Analysis

LACMTA

The LA Metro Bus Rapid Transit (BRT) Orange Line is one of the highest volume BRT lines in the US, providing service across the San Fernando Valley to the Metro Red Line subway. Tenco used the LA Department of Transportation Automated Traffic Surveillance and Control traffic signal status and bus real-time GPS data feed to determine traffic signal delays on the line. The analysis showed significant opportunities to reduce travel time and improve service.